Harvey Browne Memorial Presbyterian Church

Harvey Browne Memorial Presbyterian Church in Louisville, Ky

Project Description

Construction included the complete demolition and retro-fitting of the existing church building shell. The result was a “new” 800 seat 16,000 sq. ft. sanctuary and pre-school. Also included was an enhanced pre-school beneath the existing church, expanded lobby and gathering space. Construction included new sound, video, and theatrical lighting systems.

Project Unique Characteristics:

  • Retro-fitted the existing exposed glue-laminated shell to provide new mechanical, electrical, plumbing and fire suppression systems.
  • Coordinated daily construction activities with pre-school director and facilities director
  • Restored existing organ and provided a new organ façade with additional façade organ piping.

PROJECT DURATION
2 Years

PROJECT VALUE
$2.5 Million

CONTRACT TYPE
CM at Risk (GMP)

SERVICES PROVIDED
Pre-Construction Services
Construction Estimates
Constructability Reviews
Master Schedule Development
Construction Cash Flow Analysis
Coordination Meetings
Value Engineering
Subcontractor Pre-Qualification
Existing Conditions Verification
Construction Services
Budget Management
Schedule Management
Infection Control Measures
Change Order Control
Ongoing Value Engineering
Progress Meetings
Coordination of Medical Equipment
Quality Control
Coordination with Local Governing Bodies

ARCHITECT CONTACT
Mark Trier
JRA Architects
Louisville, KY
Phone 502.583.4697

CLIENT CONTACT
Dale Allison, Construction Committee Board Chair
502.727.3157
Larry Brandenburg
Church Administrator
502.896.1791