Clark Regional Medical Center
Replacement Facility & Medical Office Building

 

clark-memorial

Clark Regional Medical Center Construction Project in Kentucky

Project Description

Wehr Constructors provided pre-construction and construction management services for this 134,000 square foot replacement facility in Winchester, KY. The single-story 79 bed facility included four operating rooms, an emergency department, a full service radiology department, women’s center, transitional care unit, lab, pharmacy and dietary facilities. The facility was built to readily add two additional operating rooms, four labor/delivery/recovery rooms and two post-partum rooms. Clark Regional is the first healthcare facility in Kentucky to fully utilize geothermal heating and cooling systems.

Wehr Constructors also provided pre-construction and construction management services on the adjacent 45,000 square foot, three-story medical office building. The building includes spaces for physical therapy, lab draw, orthopedic services and medical office space.

Project Duration
Hospital: 14 months
Office Building: 10 months

Project Value
$45 Million

Contract Type
CM at Risk (GMP)

Services Provided
Pre-Construction Services
Construction Estimates
Constructability Reviews
Coordination Meetings
Construction Cash Flow Analysis
Value Engineering
Subcontractor Pre-Qualification
Existing Conditions Verification
Phasing Planning
Construction Services
Budget Management
Schedule Management
Progress Meetings
Change Order Control
Infection Control Measures
Ongoing Value Engineering
Coordination of Medical Equipment
Quality Control
Coordination with Local Governing Bodies

Architect Contact
Charles Hill, Stengel-Hill Architecture
Louisville, KY
502.893.1875

Client Contact
Dave Doscher, LifePoint Hospitals,Inc.
Brentwood, TN
615.565.1559